Erw Steel Pipe - Steel Pipe Cut to Length – Rainbow
Erw Steel Pipe - Steel Pipe Cut to Length – Rainbow Detail:
We can cut the pipe to certin length according to customer’s requirement.
| Product Description | ||||||
| Product name | hot dipped galvanized steel pipe | |||||
| Pipe end | plain end | |||||
| Pipe Length | 3 meters-12 meters | |||||
| Outside daimeter | 1/2 inch-8 inch | |||||
| Pipe fittings | threaded, coupling, caps, flange, etc | |||||
| Materials | Q195, Q235, Q235B, St37-2, St52, SS400, STK500, ASTM A53, S235JR | |||||
| Standard | API 5CT, GB/T3091, ASTM A53, JIS G 3443 | |||||
| Surface | galvanized | |||||
| Zinc Coating | > 210g/m2 | |||||
| Payment term | T/T, L/C | |||||
| Applications | water pipe, low fluid transportation, scaffolding pipe, greenhouse pipes | |||||
| Certificate | ISO9001, SGS, TUV, BV | |||||
| Specifications of Pre Galvanized Steel Pipe | ||||||
| Round Pipe | Rectangular Tube | Square Tube | ||||
| Nominal | Thickness | Size | Thickness | Size | Thickness | |
| IN | MM | MM | MM | MM | MM | MM |
| 1/2″ | 20 | 0.8-2.2 | 20*40 | 0.8-2.0 | 16*16 | 0.8-1.5 |
| 3/4” | 25 | 0.8-2.2 | 25*50 | 0.8-2.0 | 19*19 | 0.8-2.0 |
| —— | 25.4 | 0.8-2.2 | 30*40 | 0.8-2.0 | 20*20 | 0.8-2.0 |
| 1″ | 32 | 0.8-2.2 | 30*50 | 0.8-2.0 | 25*25 | 0.8-2.0 |
| —— | 38 | 1.0-2.2 | 37*57 | 0.8-2.0 | 30*30 | 0.8-2.0 |
| 1-1/4′ | 40 | 1.0-2.2 | 40*60 | 0.8-2.0 | 32*32 | 0.8-2.0 |
| —— | 42 | 1.0-2.3 | 37*77 | 0.8-2.0 | 35*35 | 0.8-2.0 |
| 1-1/2′ | 47 | 1.0-2.3 | 25*75 | 0.9-2.0 | 38*38 | 0.8-2.0 |
| —— | 48 | 1.0-2.3 | 40*80 | 1.0-2.2 | 40*40 | 0.8-2.0 |
| 2″ | 59 | 1.0-2.3 | 50*100 | 1.0-2.2 | 50*50 | 0.8-2.2 |
| —— | 60.3 | 1.0-2.3 | 50*75 | 1.0-2.2 | 60*60 | 1.0-2.2 |
| 2-1/2″ | 75 | 1.0-2.3 | 38*75 | 1.0-2.2 | 75*75 | 1.0-2.2 |
| 3″ | 87 | 1.0-2.3 | 50*150 | 1.3-2.2 | 80*80 | 1.0-2.2 |
| 4″ | 113 | 1.0-2.3 | 100*100 | 1.2-2.2 | ||
FAQ:
1. Q: Do you charge for the mold? How much is? Can it be returned? How to return it?
A: Only specilized size will be charged for mold, it will be returned if you have regular order.
2. Q: How long is the normal delivery time for your products?
A: It according to the quantity. Normally, it will be 30-40 days after receiving the deposit.
Product detail pictures:
Related Product Guide:
Greenhouse commonly used steel greenhouse introduction
Technical Specification for safety of steel pipe scaffold for construction
Our company sticks into the basic principle of "Quality is definitely the life of the business, and status may be the soul of it" for Erw Steel Pipe - Steel Pipe Cut to Length – Rainbow , The product will supply to all over the world, such as: Guinea, Australia, Italy, In order to meet more market demands and long-term development, a 150, 000-square-meter new factory is under construction, which will be put into use in 2014. Then, we shall own a large capacity of producing. Of course, we will continue improving the service system to meet the requirements of customers, bringing health, happiness and beauty to everyone.
Good quality and fast delivery, it's very nice. Some products have a little bit problem, but the supplier replaced timely, overall, we are satisfied.
Write your message here and send it to us










