Erw Carbon Steel Pipe Price - Steel Pipe Cut to Length – Rainbow
Erw Carbon Steel Pipe Price - Steel Pipe Cut to Length – Rainbow Detail:
We can cut the pipe to certin length according to customer’s requirement.
| Product Description | ||||||
| Product name | hot dipped galvanized steel pipe | |||||
| Pipe end | plain end | |||||
| Pipe Length | 3 meters-12 meters | |||||
| Outside daimeter | 1/2 inch-8 inch | |||||
| Pipe fittings | threaded, coupling, caps, flange, etc | |||||
| Materials | Q195, Q235, Q235B, St37-2, St52, SS400, STK500, ASTM A53, S235JR | |||||
| Standard | API 5CT, GB/T3091, ASTM A53, JIS G 3443 | |||||
| Surface | galvanized | |||||
| Zinc Coating | > 210g/m2 | |||||
| Payment term | T/T, L/C | |||||
| Applications | water pipe, low fluid transportation, scaffolding pipe, greenhouse pipes | |||||
| Certificate | ISO9001, SGS, TUV, BV | |||||
| Specifications of Pre Galvanized Steel Pipe | ||||||
| Round Pipe | Rectangular Tube | Square Tube | ||||
| Nominal | Thickness | Size | Thickness | Size | Thickness | |
| IN | MM | MM | MM | MM | MM | MM |
| 1/2″ | 20 | 0.8-2.2 | 20*40 | 0.8-2.0 | 16*16 | 0.8-1.5 |
| 3/4” | 25 | 0.8-2.2 | 25*50 | 0.8-2.0 | 19*19 | 0.8-2.0 |
| —— | 25.4 | 0.8-2.2 | 30*40 | 0.8-2.0 | 20*20 | 0.8-2.0 |
| 1″ | 32 | 0.8-2.2 | 30*50 | 0.8-2.0 | 25*25 | 0.8-2.0 |
| —— | 38 | 1.0-2.2 | 37*57 | 0.8-2.0 | 30*30 | 0.8-2.0 |
| 1-1/4′ | 40 | 1.0-2.2 | 40*60 | 0.8-2.0 | 32*32 | 0.8-2.0 |
| —— | 42 | 1.0-2.3 | 37*77 | 0.8-2.0 | 35*35 | 0.8-2.0 |
| 1-1/2′ | 47 | 1.0-2.3 | 25*75 | 0.9-2.0 | 38*38 | 0.8-2.0 |
| —— | 48 | 1.0-2.3 | 40*80 | 1.0-2.2 | 40*40 | 0.8-2.0 |
| 2″ | 59 | 1.0-2.3 | 50*100 | 1.0-2.2 | 50*50 | 0.8-2.2 |
| —— | 60.3 | 1.0-2.3 | 50*75 | 1.0-2.2 | 60*60 | 1.0-2.2 |
| 2-1/2″ | 75 | 1.0-2.3 | 38*75 | 1.0-2.2 | 75*75 | 1.0-2.2 |
| 3″ | 87 | 1.0-2.3 | 50*150 | 1.3-2.2 | 80*80 | 1.0-2.2 |
| 4″ | 113 | 1.0-2.3 | 100*100 | 1.2-2.2 | ||
FAQ:
1. Q: Do you charge for the mold? How much is? Can it be returned? How to return it?
A: Only specilized size will be charged for mold, it will be returned if you have regular order.
2. Q: How long is the normal delivery time for your products?
A: It according to the quantity. Normally, it will be 30-40 days after receiving the deposit.
Product detail pictures:
Related Product Guide:
Steel Deep Processing
Fire protection measures for steel structures
Reliable quality and good credit standing are our principles, which will help us at a top-ranking position. Adhering to the tenet of "quality first, customer supreme" for Erw Carbon Steel Pipe Price - Steel Pipe Cut to Length – Rainbow , The product will supply to all over the world, such as: Madagascar, Grenada, Sevilla, Our company abides by the management idea of "keep innovation, pursue excellence". On the basis of assuring the advantages of existing products, we continuously strengthen and extend product development. Our company insists on innovation to promote the sustainable development of enterprise, and make us become the domestic high-quality suppliers.
The product classification is very detailed that can be very accurate to meet our demand, a professional wholesaler.
Write your message here and send it to us










