Bottom price Erw Steel Pipe - Steel Pipe Cut to Length – Rainbow
Bottom price Erw Steel Pipe - Steel Pipe Cut to Length – Rainbow Detail:
We can cut the pipe to certin length according to customer’s requirement.
| Product Description | ||||||
| Product name | hot dipped galvanized steel pipe | |||||
| Pipe end | plain end | |||||
| Pipe Length | 3 meters-12 meters | |||||
| Outside daimeter | 1/2 inch-8 inch | |||||
| Pipe fittings | threaded, coupling, caps, flange, etc | |||||
| Materials | Q195, Q235, Q235B, St37-2, St52, SS400, STK500, ASTM A53, S235JR | |||||
| Standard | API 5CT, GB/T3091, ASTM A53, JIS G 3443 | |||||
| Surface | galvanized | |||||
| Zinc Coating | > 210g/m2 | |||||
| Payment term | T/T, L/C | |||||
| Applications | water pipe, low fluid transportation, scaffolding pipe, greenhouse pipes | |||||
| Certificate | ISO9001, SGS, TUV, BV | |||||
| Specifications of Pre Galvanized Steel Pipe | ||||||
| Round Pipe | Rectangular Tube | Square Tube | ||||
| Nominal | Thickness | Size | Thickness | Size | Thickness | |
| IN | MM | MM | MM | MM | MM | MM |
| 1/2″ | 20 | 0.8-2.2 | 20*40 | 0.8-2.0 | 16*16 | 0.8-1.5 |
| 3/4” | 25 | 0.8-2.2 | 25*50 | 0.8-2.0 | 19*19 | 0.8-2.0 |
| —— | 25.4 | 0.8-2.2 | 30*40 | 0.8-2.0 | 20*20 | 0.8-2.0 |
| 1″ | 32 | 0.8-2.2 | 30*50 | 0.8-2.0 | 25*25 | 0.8-2.0 |
| —— | 38 | 1.0-2.2 | 37*57 | 0.8-2.0 | 30*30 | 0.8-2.0 |
| 1-1/4′ | 40 | 1.0-2.2 | 40*60 | 0.8-2.0 | 32*32 | 0.8-2.0 |
| —— | 42 | 1.0-2.3 | 37*77 | 0.8-2.0 | 35*35 | 0.8-2.0 |
| 1-1/2′ | 47 | 1.0-2.3 | 25*75 | 0.9-2.0 | 38*38 | 0.8-2.0 |
| —— | 48 | 1.0-2.3 | 40*80 | 1.0-2.2 | 40*40 | 0.8-2.0 |
| 2″ | 59 | 1.0-2.3 | 50*100 | 1.0-2.2 | 50*50 | 0.8-2.2 |
| —— | 60.3 | 1.0-2.3 | 50*75 | 1.0-2.2 | 60*60 | 1.0-2.2 |
| 2-1/2″ | 75 | 1.0-2.3 | 38*75 | 1.0-2.2 | 75*75 | 1.0-2.2 |
| 3″ | 87 | 1.0-2.3 | 50*150 | 1.3-2.2 | 80*80 | 1.0-2.2 |
| 4″ | 113 | 1.0-2.3 | 100*100 | 1.2-2.2 | ||
FAQ:
1. Q: Do you charge for the mold? How much is? Can it be returned? How to return it?
A: Only specilized size will be charged for mold, it will be returned if you have regular order.
2. Q: How long is the normal delivery time for your products?
A: It according to the quantity. Normally, it will be 30-40 days after receiving the deposit.
Product detail pictures:
Related Product Guide:
Technical Specification for safety of steel pipe scaffold for construction
Steel Deep Processing
We take "customer-friendly, quality-oriented, integrative, innovative" as objectives. "Truth and honesty" is our management ideal for Bottom price Erw Steel Pipe - Steel Pipe Cut to Length – Rainbow , The product will supply to all over the world, such as: Anguilla, Naples, Florida, Our products are mainly exported to Europe, Africa, America, the Middle East and Southeast Asia and other countries and regions. We have enjoyed a great reputation among our customers for quality products and good services.We would make friends with businessmen from at home and abroad, following the purpose of "Quality First, Reputation First, the Best Services."
Hope that the company could stick to the enterprise spirit of "Quality, Efficiency, Innovation and Integrity", it will be better and better in the future.
Write your message here and send it to us










