Arc Welded Steel Pipe - Steel Pipe Cut to Length – Rainbow
Arc Welded Steel Pipe - Steel Pipe Cut to Length – Rainbow Detail:
We can cut the pipe to certin length according to customer’s requirement.
| Product Description | ||||||
| Product name | hot dipped galvanized steel pipe | |||||
| Pipe end | plain end | |||||
| Pipe Length | 3 meters-12 meters | |||||
| Outside daimeter | 1/2 inch-8 inch | |||||
| Pipe fittings | threaded, coupling, caps, flange, etc | |||||
| Materials | Q195, Q235, Q235B, St37-2, St52, SS400, STK500, ASTM A53, S235JR | |||||
| Standard | API 5CT, GB/T3091, ASTM A53, JIS G 3443 | |||||
| Surface | galvanized | |||||
| Zinc Coating | > 210g/m2 | |||||
| Payment term | T/T, L/C | |||||
| Applications | water pipe, low fluid transportation, scaffolding pipe, greenhouse pipes | |||||
| Certificate | ISO9001, SGS, TUV, BV | |||||
| Specifications of Pre Galvanized Steel Pipe | ||||||
| Round Pipe | Rectangular Tube | Square Tube | ||||
| Nominal | Thickness | Size | Thickness | Size | Thickness | |
| IN | MM | MM | MM | MM | MM | MM |
| 1/2″ | 20 | 0.8-2.2 | 20*40 | 0.8-2.0 | 16*16 | 0.8-1.5 |
| 3/4” | 25 | 0.8-2.2 | 25*50 | 0.8-2.0 | 19*19 | 0.8-2.0 |
| —— | 25.4 | 0.8-2.2 | 30*40 | 0.8-2.0 | 20*20 | 0.8-2.0 |
| 1″ | 32 | 0.8-2.2 | 30*50 | 0.8-2.0 | 25*25 | 0.8-2.0 |
| —— | 38 | 1.0-2.2 | 37*57 | 0.8-2.0 | 30*30 | 0.8-2.0 |
| 1-1/4′ | 40 | 1.0-2.2 | 40*60 | 0.8-2.0 | 32*32 | 0.8-2.0 |
| —— | 42 | 1.0-2.3 | 37*77 | 0.8-2.0 | 35*35 | 0.8-2.0 |
| 1-1/2′ | 47 | 1.0-2.3 | 25*75 | 0.9-2.0 | 38*38 | 0.8-2.0 |
| —— | 48 | 1.0-2.3 | 40*80 | 1.0-2.2 | 40*40 | 0.8-2.0 |
| 2″ | 59 | 1.0-2.3 | 50*100 | 1.0-2.2 | 50*50 | 0.8-2.2 |
| —— | 60.3 | 1.0-2.3 | 50*75 | 1.0-2.2 | 60*60 | 1.0-2.2 |
| 2-1/2″ | 75 | 1.0-2.3 | 38*75 | 1.0-2.2 | 75*75 | 1.0-2.2 |
| 3″ | 87 | 1.0-2.3 | 50*150 | 1.3-2.2 | 80*80 | 1.0-2.2 |
| 4″ | 113 | 1.0-2.3 | 100*100 | 1.2-2.2 | ||
FAQ:
1. Q: Do you charge for the mold? How much is? Can it be returned? How to return it?
A: Only specilized size will be charged for mold, it will be returned if you have regular order.
2. Q: How long is the normal delivery time for your products?
A: It according to the quantity. Normally, it will be 30-40 days after receiving the deposit.
Product detail pictures:
Related Product Guide:
Technical Specification for safety of steel pipe scaffold for construction
Steel Deep Processing
We also offer product sourcing and flight consolidation services. We have our own factory and sourcing office. We can provide you with almost every type of product related to our product range for Arc Welded Steel Pipe - Steel Pipe Cut to Length – Rainbow , The product will supply to all over the world, such as: Germany, Norwegian, Guatemala, We've got constructed strong and long co-operation relationship with an enormous quantity of companies within this business overseas. Immediate and specialist after-sale service supplied by our consultant group has happy our buyers. In depth Info and parameters from the merchandise will probably be sent to you for any thorough acknowledge. Free samples may be delivered and company check out to our corporation. n Portugal for negotiation is constantly welcome. Hope to get inquiries type you and construct a long-term co-operation partnership.
This is a reputable company, they have a high level of business management, good quality product and service, every cooperation is assured and delighted!
Write your message here and send it to us









